RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1414016187 - Archived data from Tue, 11. August 2020 17:26:20 CEST


This is all the information about APD 1414016187. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1414016187
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 392.7 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 41
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 406
Position in grid: 0
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 29. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.1975204 V     T = -25 °C: 356.0157323 V
Voltage for Gain 150: T = +20 °C: 400.1592296 V     T = -25 °C: 363.6623321 V
Voltage for Gain 200: T = +20 °C: 404.5917484 V     T = -25 °C: 367.9733514 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.615479213 V-1     T = -25 °C: 4.594156074 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.850622637 V-1     T = -25 °C: 8.744472314 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.85819261 V-1     T = -25 °C: 14.57108345 V-1
Break-through voltage: T = +20 °C: 418.8511666 V     T = -25 °C: 382.5614804 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:28 CET jreher Updated box and position via API.
03. Feb 2021 18:19:15 CET jreher Updated box and position via API.
11. Aug 2020 17:26:20 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:14 CET jreher Updated APD location via API.
25. Nov 2019 17:14:08 CET jreher Updated box and position via API.
04. Jul 2019 11:11:10 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:27 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:23 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 15:10:50 CET markus.moritz Entered shipped after irradiation date.
03. Dec 2018 14:51:40 CET markus.moritz
29. Sep 2017 12:27:36 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:35 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:40:54 CEST Tobias Imported from Hamamatsu datasheet.