RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1414016163 - Archived data from Tue, 11. August 2020 17:58:45 CEST


This is all the information about APD 1414016163. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1414016163
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 393.4 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 309
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 405
Position in grid: 0
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Nov 2017
Dose used: 45 Gy
Temperature: 25 °C
Position: 4
Bias voltage: 393.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.6168981 V     T = -25 °C: 357.0351705 V
Voltage for Gain 150: T = +20 °C: 401.5645956 V     T = -25 °C: 364.7488467 V
Voltage for Gain 200: T = +20 °C: 405.9639361 V     T = -25 °C: 369.0822764 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.368104856 V-1     T = -25 °C: 4.716469537 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.426141168 V-1     T = -25 °C: 9.326087247 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.56989135 V-1     T = -25 °C: 14.54776597 V-1
Break-through voltage: T = +20 °C: 421.8862487 V     T = -25 °C: 385.2743645 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:17:48 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:14:54 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:28:22 CET jreher Updated box and position via API.
11. Aug 2020 17:58:45 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:11 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:02 CEST jreher Updated box and position via API.
19. Dec 2019 16:48:02 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:03 CET jreher Updated box and position via API.
10. Nov 2017 09:39:11 CET markus.moritz Entered shipped after irradiation date.
09. Nov 2017 15:00:58 CET markus.moritz Entered irradiation information.
29. Sep 2017 11:57:06 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:34 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:49 CEST Tobias Imported from Hamamatsu datasheet.