RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1412015982 - Archived data from Wed, 07. October 2020 12:18:05 CEST


This is all the information about APD 1412015982. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1412015982
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2710030775/1412015982
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 393.1 V
Dark current: 9.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 41
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 397
Position in grid: 5
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.3170348 V     T = -25 °C: 356.8902956 V
Voltage for Gain 150: T = +20 °C: 401.2716535 V     T = -25 °C: 364.602594 V
Voltage for Gain 200: T = +20 °C: 405.6736302 V     T = -25 °C: 368.8913468 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.422910802 V-1     T = -25 °C: 4.58412081 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.393450554 V-1     T = -25 °C: 9.841745769 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.04400168 V-1     T = -25 °C: 14.3373683 V-1
Break-through voltage: T = +20 °C: 420.9165214 V     T = -25 °C: 384.3991998 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:30 CET jreher Updated box and position via API.
03. Feb 2021 18:19:16 CET jreher Updated box and position via API.
07. Oct 2020 12:18:05 CEST jreher Assigned to capsule by script
06. Oct 2020 16:51:23 CEST jreher Updated box and position via API.
11. Aug 2020 17:26:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:15 CET jreher Updated APD location via API.
25. Nov 2019 17:14:10 CET jreher Updated box and position via API.
04. Jul 2019 11:11:11 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:28 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:24 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 15:41:33 CET markus.moritz
26. Nov 2018 15:40:18 CET markus.moritz
29. Sep 2017 13:50:06 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:29 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:45 CEST Tobias Imported from Hamamatsu datasheet.