RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1412015961 - Archived data from Wed, 03. February 2021 18:18:43 CET


This is all the information about APD 1412015961. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1412015961
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 391.7 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 37
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 396
Position in grid: 4
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 29. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.0485489 V     T = -25 °C: 355.819562 V
Voltage for Gain 150: T = +20 °C: 400.0348626 V     T = -25 °C: 363.4493982 V
Voltage for Gain 200: T = +20 °C: 404.4611362 V     T = -25 °C: 367.7448214 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.442410659 V-1     T = -25 °C: 4.777946462 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.552241924 V-1     T = -25 °C: 9.368836908 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.50768698 V-1     T = -25 °C: 14.47277588 V-1
Break-through voltage: T = +20 °C: 420.3523985 V     T = -25 °C: 383.5475731 V
   
Notes:


Version history

Time Author Change comment
27. Sep 2021 16:13:10 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:17:53 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:52:48 CET jreher Updated box and position via API.
03. Feb 2021 18:18:43 CET jreher Updated box and position via API.
11. Aug 2020 17:25:41 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:23:11 CET jreher Updated APD location via API.
25. Nov 2019 17:13:48 CET jreher Updated box and position via API.
13. Jun 2019 11:29:55 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:05 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 14:34:42 CET markus.moritz Entered shipped after irradiation date.
03. Jan 2019 14:34:27 CET markus.moritz Entered shipped after irradiation date.
03. Dec 2018 14:46:00 CET markus.moritz
29. Sep 2017 12:31:12 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:29 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:44 CEST Tobias Imported from Hamamatsu datasheet.