RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1412015953 - Archived data from Tue, 11. August 2020 17:25:55 CEST


This is all the information about APD 1412015953. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1412015953
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 392.7 V
Dark current: 8.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 38
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 395
Position in grid: 16
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 16. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.7511271 V     T = -25 °C: 357.1445424 V
Voltage for Gain 150: T = +20 °C: 401.6610311 V     T = -25 °C: 364.8190973 V
Voltage for Gain 200: T = +20 °C: 406.0576865 V     T = -25 °C: 369.1405491 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.407279641 V-1     T = -25 °C: 4.701421141 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.070687489 V-1     T = -25 °C: 8.790240191 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35727994 V-1     T = -25 °C: 15.65135688 V-1
Break-through voltage: T = +20 °C: 421.2799215 V     T = -25 °C: 384.4736364 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:07 CET jreher Updated box and position via API.
03. Feb 2021 18:18:53 CET jreher Updated box and position via API.
11. Aug 2020 17:25:55 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:35:43 CET jreher Updated APD location via API.
25. Nov 2019 17:13:55 CET jreher Updated box and position via API.
04. Jul 2019 11:10:47 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:15 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:11 CEST jreher Updated APD batch assignment via API.
18. Jan 2019 14:32:36 CET markus.moritz Entered shipped after irradiation date.
03. Dec 2018 12:15:17 CET markus.moritz
29. Sep 2017 11:19:07 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:28 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:44 CEST Tobias Imported from Hamamatsu datasheet.