Show Hamamatsu Avalanche Photo Diode 1410015800 - Archived data from Tue, 11. August 2020 17:24:46 CEST
					This is all the information about APD 1410015800. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 1410015800 | 
| Type: | Hamamatsu Avalanche Photo Diode | 
| Detector: | unassigned | 
| Unit: | unassigned | 
| Preamp: | 0 | 
| Current location: | Bochum | 
| Installation information: | |
| Label: | none | 
| Manufacturer information: | |
| Wafer position: | C10 | 
| Break-through voltage: | 427 V | 
| Voltage for Gain 100 (T=+25°C): | 398.3 V | 
| Dark current: | 5.7 nA | 
| Screening Logistics: | |
| Available: | Yes | 
| Storage Box: | 31 | 
| Position in Box: | 40 | 
| EP1 batch: | none | 
| EP1 batch after irradiation: | none | 
| Shipment: | |
| Grid number: | 389 | 
| Position in grid: | 5 | 
| Arrival for irradiation: | 29. Sep 2017 | 
| Sent for analysis after irradiation: | 16. Jan 2019 | 
| Return for assembly: | none | 
| Irradiation: | |
| Date: | 29. Nov 2018 | 
| Dose used: | 37 Gy | 
| Temperature: | 20 °C | 
| Position: | none | 
| Bias voltage: | none | 
| Annealing: | |
| Date: | 30. Nov 2018 | 
| Temperature: | 80 °C | 
| Duration: | 48 h | 
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 399.2753086 V T = -25 °C: 362.3486869 V | 
| Voltage for Gain 150: | T = +20 °C: 407.1748877 V T = -25 °C: 370.1013918 V | 
| Voltage for Gain 200: | T = +20 °C: 411.5929346 V T = -25 °C: 374.4496621 V | 
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.470075313 V-1 T = -25 °C: 4.516444236 V-1 | 
| Gain/Voltage slope at M = 150: | T = +20 °C: 9.052773821 V-1 T = -25 °C: 8.971353642 V-1 | 
| Gain/Voltage slope at M = 200: | T = +20 °C: 14.859725 V-1 T = -25 °C: 15.29509716 V-1 | 
| Break-through voltage: | T = +20 °C: 426.3578351 V T = -25 °C: 389.7404976 V | 
| Notes: | 
						
					
Version history
| Time | Author | Change comment | 
|---|---|---|
| 05. Feb 2021 10:51:53 CET | jreher | Updated box and position via API. | 
| 03. Feb 2021 18:17:59 CET | jreher | Updated box and position via API. | 
| 11. Aug 2020 17:24:46 CEST | jreher | Updated APD characteristics via API. | 
| 28. Nov 2019 12:22:05 CET | jreher | Updated APD location via API. | 
| 25. Nov 2019 17:13:20 CET | jreher | Updated box and position via API. | 
| 13. Jun 2019 11:28:34 CEST | jreher | Updated APD location via API. | 
| 12. Jun 2019 16:47:44 CEST | jreher | Updated APD batch assignment via API. | 
| 12. Jun 2019 16:32:39 CEST | jreher | Updated APD batch assignment via API. | 
| 18. Jan 2019 14:31:36 CET | markus.moritz | Entered shipped after irradiation date. | 
| 03. Dec 2018 14:23:07 CET | markus.moritz | |
| 29. Sep 2017 11:20:23 CEST | markus.moritz | Entered arrival for irradiation date. | 
| 01. Aug 2016 17:29:46 CEST | Tobias | Assigned to grid via information extracted from APD DB. | 
| 23. Jun 2016 10:39:41 CEST | Tobias | Imported from Hamamatsu datasheet. | 
 
						 
					