RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1409015721 - Archived data from Tue, 11. August 2020 17:58:17 CEST


This is all the information about APD 1409015721. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1409015721
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 424 V
Voltage for Gain 100 (T=+25°C): 395.5 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 306
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 386
Position in grid: 3
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 395.5 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 396.7779249 V     T = -25 °C: 360.0950532 V
Voltage for Gain 150: T = +20 °C: 404.6821978 V     T = -25 °C: 367.7901797 V
Voltage for Gain 200: T = +20 °C: 409.0578712 V     T = -25 °C: 372.0773408 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.652324608 V-1     T = -25 °C: 4.709454134 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.173415902 V-1     T = -25 °C: 9.355214827 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.34901514 V-1     T = -25 °C: 14.57196671 V-1
Break-through voltage: T = +20 °C: 424.5322618 V     T = -25 °C: 387.9335991 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:55 CET jreher Updated box and position via API.
11. Aug 2020 17:58:17 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:27 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:18 CEST jreher Updated box and position via API.
19. Dec 2019 16:35:06 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:39 CET jreher Updated box and position via API.
10. Nov 2017 09:39:01 CET markus.moritz Entered shipped after irradiation date.
09. Nov 2017 15:01:55 CET markus.moritz Entered irradiation information.
29. Sep 2017 11:46:58 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:22 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:32:30 CEST Tobias Imported from Hamamatsu datasheet.