RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1409015713 - Archived data from Wed, 03. February 2021 18:18:14 CET


This is all the information about APD 1409015713. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1409015713
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1414016119/1409015713
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.4 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 33
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 385
Position in grid: 15
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.2198561 V     T = -25 °C: 356.0172651 V
Voltage for Gain 150: T = +20 °C: 400.1917743 V     T = -25 °C: 363.6897451 V
Voltage for Gain 200: T = +20 °C: 404.6086751 V     T = -25 °C: 368.0216941 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.406945976 V-1     T = -25 °C: 4.677701237 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.43424297 V-1     T = -25 °C: 9.113424651 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.2959509 V-1     T = -25 °C: 15.68747745 V-1
Break-through voltage: T = +20 °C: 420.4039357 V     T = -25 °C: 383.9711455 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:08 CET jreher Updated box and position via API.
03. Feb 2021 18:18:14 CET jreher Updated box and position via API.
11. Aug 2020 17:25:06 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:49:36 CEST jreher Assigned to capsule by script
13. Feb 2020 15:11:37 CET jreher Updated box and position via API.
28. Nov 2019 12:22:27 CET jreher Updated APD location via API.
25. Nov 2019 17:13:30 CET jreher Updated box and position via API.
13. Jun 2019 11:29:03 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:48 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 13:48:32 CET markus.moritz
29. Sep 2017 13:36:52 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:22 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:32:30 CEST Tobias Imported from Hamamatsu datasheet.