Show Hamamatsu Avalanche Photo Diode 1408015692 - Archived data from Wed, 03. February 2021 18:18:46 CET
This is all the information about APD 1408015692. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 1408015692 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | B05 |
| Break-through voltage: | 421 V |
| Voltage for Gain 100 (T=+25°C): | 392.3 V |
| Dark current: | 7 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 37 |
| Position in Box: | 48 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | 384 |
| Position in grid: | 14 |
| Arrival for irradiation: | 29. Sep 2017 |
| Sent for analysis after irradiation: | 16. Jan 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 28. Nov 2018 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 30. Nov 2018 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 392.5943128 V T = -25 °C: 356.1903587 V |
| Voltage for Gain 150: | T = +20 °C: 400.632713 V T = -25 °C: 363.8625859 V |
| Voltage for Gain 200: | T = +20 °C: 404.9841271 V T = -25 °C: 368.1924207 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.148263553 V-1 T = -25 °C: 4.655555021 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 9.515018263 V-1 T = -25 °C: 8.54511019 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 13.78149495 V-1 T = -25 °C: 14.3743798 V-1 |
| Break-through voltage: | T = +20 °C: 420.6200239 V T = -25 °C: 383.9240059 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 10:52:59 CET | jreher | Updated box and position via API. |
| 03. Feb 2021 18:18:46 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:25:48 CEST | jreher | Updated APD characteristics via API. |
| 28. Nov 2019 12:23:13 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:13:51 CET | jreher | Updated box and position via API. |
| 13. Jun 2019 11:29:57 CEST | jreher | Updated APD location via API. |
| 12. Jun 2019 16:48:12 CEST | jreher | Updated APD batch assignment via API. |
| 12. Jun 2019 16:33:08 CEST | jreher | Updated APD batch assignment via API. |
| 18. Jan 2019 14:45:41 CET | markus.moritz | |
| 03. Dec 2018 13:26:17 CET | markus.moritz | |
| 29. Sep 2017 14:07:20 CEST | markus.moritz | Entered arrival for irradiation date. |
| 01. Aug 2016 17:29:21 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
| 23. Jun 2016 10:32:29 CEST | Tobias | Imported from Hamamatsu datasheet. |