Show Hamamatsu Avalanche Photo Diode 1408015641 - Archived data from Tue, 11. August 2020 17:25:36 CEST
This is all the information about APD 1408015641. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 1408015641 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | B13 |
| Break-through voltage: | 422 V |
| Voltage for Gain 100 (T=+25°C): | 395.1 V |
| Dark current: | 5 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 36 |
| Position in Box: | 37 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | 382 |
| Position in grid: | 3 |
| Arrival for irradiation: | 29. Sep 2017 |
| Sent for analysis after irradiation: | 03. Jan 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 05. Dec 2018 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 10. Dec 2018 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 394.9994848 V T = -25 °C: 358.5722799 V |
| Voltage for Gain 150: | T = +20 °C: 402.9372253 V T = -25 °C: 366.2693713 V |
| Voltage for Gain 200: | T = +20 °C: 407.3688793 V T = -25 °C: 370.5872793 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.445145718 V-1 T = -25 °C: 4.836554259 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 8.774681841 V-1 T = -25 °C: 8.915281495 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 15.27000414 V-1 T = -25 °C: 14.21486533 V-1 |
| Break-through voltage: | T = +20 °C: 421.9354919 V T = -25 °C: 385.2242485 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 10:52:43 CET | jreher | Updated box and position via API. |
| 03. Feb 2021 18:18:37 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:25:36 CEST | jreher | Updated APD characteristics via API. |
| 28. Nov 2019 12:23:01 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:13:45 CET | jreher | Updated box and position via API. |
| 13. Jun 2019 11:29:44 CEST | jreher | Updated APD location via API. |
| 12. Jun 2019 16:48:07 CEST | jreher | Updated APD batch assignment via API. |
| 12. Jun 2019 16:33:02 CEST | jreher | Updated APD batch assignment via API. |
| 03. Jan 2019 12:34:24 CET | markus.moritz | |
| 29. Sep 2017 12:25:25 CEST | markus.moritz | Entered arrival for irradiation date. |
| 01. Aug 2016 17:29:19 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
| 23. Jun 2016 10:32:27 CEST | Tobias | Imported from Hamamatsu datasheet. |