Show Hamamatsu Avalanche Photo Diode 1408015638 - Archived data from Tue, 11. August 2020 17:25:35 CEST
This is all the information about APD 1408015638. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 1408015638 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | G12 |
| Break-through voltage: | 421 V |
| Voltage for Gain 100 (T=+25°C): | 393.5 V |
| Dark current: | 5.1 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 36 |
| Position in Box: | 34 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | 382 |
| Position in grid: | 0 |
| Arrival for irradiation: | 29. Sep 2017 |
| Sent for analysis after irradiation: | 03. Jan 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 05. Dec 2018 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 10. Dec 2018 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 394.0376991 V T = -25 °C: 357.5252377 V |
| Voltage for Gain 150: | T = +20 °C: 401.935942 V T = -25 °C: 365.2201942 V |
| Voltage for Gain 200: | T = +20 °C: 406.3173882 V T = -25 °C: 369.5778195 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.308442733 V-1 T = -25 °C: 4.863088394 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 9.384207435 V-1 T = -25 °C: 8.567621063 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 15.48271211 V-1 T = -25 °C: 13.76466904 V-1 |
| Break-through voltage: | T = +20 °C: 419.2273646 V T = -25 °C: 385.4121997 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 15. Nov 2022 13:16:51 CET | oafedulidis | Assigned to capsule by script |
| 16. Dec 2021 13:41:16 CET | oafedulidis | Updated box and position via API. |
| 05. Feb 2021 10:52:42 CET | jreher | Updated box and position via API. |
| 03. Feb 2021 18:18:37 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:25:35 CEST | jreher | Updated APD characteristics via API. |
| 28. Nov 2019 12:23:01 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:13:44 CET | jreher | Updated box and position via API. |
| 13. Jun 2019 11:29:43 CEST | jreher | Updated APD location via API. |
| 12. Jun 2019 16:48:07 CEST | jreher | Updated APD batch assignment via API. |
| 12. Jun 2019 16:33:02 CEST | jreher | Updated APD batch assignment via API. |
| 03. Jan 2019 12:35:21 CET | markus.moritz | |
| 29. Sep 2017 12:25:25 CEST | markus.moritz | Entered arrival for irradiation date. |
| 01. Aug 2016 17:29:19 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
| 23. Jun 2016 10:32:27 CEST | Tobias | Imported from Hamamatsu datasheet. |