RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1407015621 - Archived data from Tue, 11. August 2020 17:25:00 CEST


This is all the information about APD 1407015621. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1407015621
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.3 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 33
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 381
Position in grid: 3
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.7169165 V     T = -25 °C: 352.5277896 V
Voltage for Gain 150: T = +20 °C: 396.6286377 V     T = -25 °C: 360.1576392 V
Voltage for Gain 200: T = +20 °C: 401.0073459 V     T = -25 °C: 364.4104084 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.643985387 V-1     T = -25 °C: 4.42854501 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.242386221 V-1     T = -25 °C: 9.580092187 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.44146266 V-1     T = -25 °C: 15.61084704 V-1
Break-through voltage: T = +20 °C: 416.6901087 V     T = -25 °C: 380.1220681 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:05 CET jreher Updated box and position via API.
03. Feb 2021 18:18:11 CET jreher Updated box and position via API.
11. Aug 2020 17:25:00 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:25 CET jreher Updated APD location via API.
25. Nov 2019 17:13:27 CET jreher Updated box and position via API.
13. Jun 2019 11:29:01 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:46 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 14:22:27 CET markus.moritz
29. Sep 2017 13:36:31 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:19 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:32:27 CEST Tobias Imported from Hamamatsu datasheet.