Show Hamamatsu Avalanche Photo Diode 1406015518 - Archived data from Wed, 03. February 2021 18:19:24 CET
This is all the information about APD 1406015518. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 1406015518 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | D02 |
| Break-through voltage: | 421 V |
| Voltage for Gain 100 (T=+25°C): | 392.4 V |
| Dark current: | 5.6 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 42 |
| Position in Box: | 18 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | 376 |
| Position in grid: | 9 |
| Arrival for irradiation: | 29. Sep 2017 |
| Sent for analysis after irradiation: | 26. Nov 2018 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 22. Nov 2018 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 23. Nov 2018 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 392.874425 V T = -25 °C: 356.5223857 V |
| Voltage for Gain 150: | T = +20 °C: 400.8790692 V T = -25 °C: 364.2111812 V |
| Voltage for Gain 200: | T = +20 °C: 405.3261955 V T = -25 °C: 368.5581748 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.444566183 V-1 T = -25 °C: 4.756127786 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 8.409439307 V-1 T = -25 °C: 9.229228011 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 14.0501962 V-1 T = -25 °C: 13.966866 V-1 |
| Break-through voltage: | T = +20 °C: 420.9776936 V T = -25 °C: 384.3670111 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 10. Jun 2022 12:28:50 CEST | oafedulidis | Assigned to capsule by script |
| 30. Aug 2021 14:08:13 CEST | oafedulidis | Updated box and position via API. |
| 05. Feb 2021 10:53:37 CET | jreher | Updated box and position via API. |
| 03. Feb 2021 18:19:24 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:26:31 CEST | jreher | Updated APD characteristics via API. |
| 27. Nov 2019 19:36:26 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:14:15 CET | jreher | Updated box and position via API. |
| 04. Jul 2019 11:11:19 CEST | jreher | Updated APD location via API. |
| 12. Jun 2019 16:48:32 CEST | jreher | Updated APD batch assignment via API. |
| 12. Jun 2019 16:33:28 CEST | jreher | Updated APD batch assignment via API. |
| 26. Nov 2018 14:33:41 CET | markus.moritz | |
| 29. Sep 2017 13:35:59 CEST | markus.moritz | Entered arrival for irradiation date. |
| 01. Aug 2016 17:29:15 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
| 23. Jun 2016 10:32:24 CEST | Tobias | Imported from Hamamatsu datasheet. |