RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1405015458 - Archived data from Fri, 05. February 2021 10:53:35 CET


This is all the information about APD 1405015458. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1405015458
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.7 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 42
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 373
Position in grid: 12
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.9800768 V     T = -25 °C: 350.9067343 V
Voltage for Gain 150: T = +20 °C: 394.9519017 V     T = -25 °C: 358.4709356 V
Voltage for Gain 200: T = +20 °C: 399.3791568 V     T = -25 °C: 362.7382811 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.445387307 V-1     T = -25 °C: 4.719575234 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.482182913 V-1     T = -25 °C: 9.27344306 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.31237028 V-1     T = -25 °C: 14.20147856 V-1
Break-through voltage: T = +20 °C: 414.2107152 V     T = -25 °C: 377.7467017 V
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:40:24 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:12 CEST jreher Updated box and position via API.
05. Feb 2021 10:53:35 CET jreher Updated box and position via API.
03. Feb 2021 18:19:22 CET jreher Updated box and position via API.
11. Aug 2020 17:26:28 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:25 CET jreher Updated APD location via API.
25. Nov 2019 17:14:14 CET jreher Updated box and position via API.
04. Jul 2019 11:11:17 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:31 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:27 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 15:19:01 CET markus.moritz
29. Sep 2017 13:35:32 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:14 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:32:22 CEST Tobias Imported from Hamamatsu datasheet.