Show Hamamatsu Avalanche Photo Diode 1404015367 - Archived data from Wed, 03. February 2021 18:19:26 CET
This is all the information about APD 1404015367. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 1404015367 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | B12 |
| Break-through voltage: | 422 V |
| Voltage for Gain 100 (T=+25°C): | 395.2 V |
| Dark current: | 8.1 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 42 |
| Position in Box: | 38 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | 369 |
| Position in grid: | 6 |
| Arrival for irradiation: | 29. Sep 2017 |
| Sent for analysis after irradiation: | 26. Nov 2018 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 22. Nov 2018 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 23. Nov 2018 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 395.2677989 V T = -25 °C: 358.295339 V |
| Voltage for Gain 150: | T = +20 °C: 402.7815011 V T = -25 °C: 366.0745687 V |
| Voltage for Gain 200: | T = +20 °C: 407.198719 V T = -25 °C: 370.3982826 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 1.919825161 V-1 T = -25 °C: 4.715532899 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 8.963035986 V-1 T = -25 °C: 8.339103628 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 13.36844388 V-1 T = -25 °C: 16.03974065 V-1 |
| Break-through voltage: | T = +20 °C: 421.6220665 V T = -25 °C: 385.4400731 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 10:53:39 CET | jreher | Updated box and position via API. |
| 03. Feb 2021 18:19:26 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:26:35 CEST | jreher | Updated APD characteristics via API. |
| 27. Nov 2019 19:36:28 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:14:16 CET | jreher | Updated box and position via API. |
| 04. Jul 2019 11:11:20 CEST | jreher | Updated APD location via API. |
| 12. Jun 2019 16:48:34 CEST | jreher | Updated APD batch assignment via API. |
| 12. Jun 2019 16:33:30 CEST | jreher | Updated APD batch assignment via API. |
| 26. Nov 2018 14:44:36 CET | markus.moritz | |
| 29. Sep 2017 13:34:43 CEST | markus.moritz | Entered arrival for irradiation date. |
| 01. Aug 2016 17:29:11 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
| 23. Jun 2016 10:31:22 CEST | Tobias | Imported from Hamamatsu datasheet. |