RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1404015362 - Archived data from Wed, 03. February 2021 18:18:10 CET


This is all the information about APD 1404015362. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1404015362
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 393.3 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 33
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 369
Position in grid: 2
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.2626824 V     T = -25 °C: 357.6258035 V
Voltage for Gain 150: T = +20 °C: 402.1767012 V     T = -25 °C: 365.3129196 V
Voltage for Gain 200: T = +20 °C: 406.5641089 V     T = -25 °C: 369.6335382 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.312417077 V-1     T = -25 °C: 4.576908159 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.293959288 V-1     T = -25 °C: 8.596730247 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.92259657 V-1     T = -25 °C: 14.48025872 V-1
Break-through voltage: T = +20 °C: 421.6608683 V     T = -25 °C: 384.9834712 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:16:53 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:41:16 CET oafedulidis Updated box and position via API.
05. Feb 2021 10:52:04 CET jreher Updated box and position via API.
03. Feb 2021 18:18:10 CET jreher Updated box and position via API.
11. Aug 2020 17:24:58 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:24 CET jreher Updated APD location via API.
25. Nov 2019 17:13:27 CET jreher Updated box and position via API.
13. Jun 2019 11:29:00 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:45 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 14:45:34 CET markus.moritz
29. Sep 2017 13:34:43 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:11 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:22 CEST Tobias Imported from Hamamatsu datasheet.