RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1403015265 - Archived data from Tue, 11. August 2020 17:58:23 CEST


This is all the information about APD 1403015265. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1403015265
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.2 V
Dark current: 9.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 307
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 364
Position in grid: 10
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 386.2 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.1319425 V     T = -25 °C: 351.4141352 V
Voltage for Gain 150: T = +20 °C: 395.0491226 V     T = -25 °C: 358.9093512 V
Voltage for Gain 200: T = +20 °C: 399.4527406 V     T = -25 °C: 363.131315 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.519825309 V-1     T = -25 °C: 4.686884226 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.855792113 V-1     T = -25 °C: 9.377176225 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.46394786 V-1     T = -25 °C: 14.66183836 V-1
Break-through voltage: T = +20 °C: 413.9614543 V     T = -25 °C: 377.6626259 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:24:18 CET oafedulidis Assigned to capsule by script
27. Aug 2021 10:30:07 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:28:05 CET jreher Updated box and position via API.
11. Aug 2020 17:58:23 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:41 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:31 CEST jreher Updated box and position via API.
19. Dec 2019 16:35:44 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:46 CET jreher Updated box and position via API.
27. Oct 2017 10:38:08 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:27:44 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:17:00 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:07 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:19 CEST Tobias Imported from Hamamatsu datasheet.