RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1402015239 - Archived data from Tue, 11. August 2020 17:58:27 CEST


This is all the information about APD 1402015239. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1402015239
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B03
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 393.5 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 307
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 363
Position in grid: 8
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 26. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 393.5 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.9783886 V     T = -25 °C: 356.6433717 V
Voltage for Gain 150: T = +20 °C: 400.9205095 V     T = -25 °C: 364.2485609 V
Voltage for Gain 200: T = +20 °C: 405.3464882 V     T = -25 °C: 368.5112548 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.484604132 V-1     T = -25 °C: 4.891900812 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.814997855 V-1     T = -25 °C: 8.89997044 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.46799261 V-1     T = -25 °C: 15.55788499 V-1
Break-through voltage: T = +20 °C: 418.1887832 V     T = -25 °C: 382.5357182 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:13:42 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:40:59 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:28:07 CET jreher Updated box and position via API.
11. Aug 2020 17:58:27 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:42 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:32 CEST jreher Updated box and position via API.
19. Dec 2019 16:36:08 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:47 CET jreher Updated box and position via API.
03. Nov 2017 16:13:01 CET markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:36:09 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:34:21 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:07 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:18 CEST Tobias Imported from Hamamatsu datasheet.