RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1319014928 - Archived data from Wed, 03. February 2021 18:18:30 CET


This is all the information about APD 1319014928. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1319014928
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 439 V
Voltage for Gain 100 (T=+25°C): 410.4 V
Dark current: 8.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 35
Position in Box: 39
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 349
Position in grid: 8
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 410.9008971 V     T = -25 °C: 374.1324981 V
Voltage for Gain 150: T = +20 °C: 418.876714 V     T = -25 °C: 382.1490913 V
Voltage for Gain 200: T = +20 °C: 423.3146473 V     T = -25 °C: 386.5192631 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.182850427 V-1     T = -25 °C: 4.744943505 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.683021858 V-1     T = -25 °C: 9.971380651 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.31107336 V-1     T = -25 °C: 14.82661559 V-1
Break-through voltage: T = +20 °C: 439.0794835 V     T = -25 °C: 402.4169354 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:34 CET jreher Updated box and position via API.
03. Feb 2021 18:18:30 CET jreher Updated box and position via API.
07. Oct 2020 15:45:58 CEST jreher Updated APD location via API.
11. Aug 2020 17:25:26 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:50 CET jreher Updated APD location via API.
25. Nov 2019 17:13:40 CET jreher Updated box and position via API.
13. Jun 2019 11:29:30 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:02 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:58 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 14:24:39 CET markus.moritz
29. Sep 2017 11:21:57 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:57 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:49 CEST Tobias Imported from Hamamatsu datasheet.