Show Hamamatsu Avalanche Photo Diode 1318014920 - Archived data from Tue, 11. August 2020 17:25:25 CEST
					This is all the information about APD 1318014920. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 1318014920 | 
| Type: | Hamamatsu Avalanche Photo Diode | 
| Detector: | unassigned | 
| Unit: | unassigned | 
| Preamp: | 0 | 
| Current location: | Bochum | 
| Installation information: | |
| Label: | none | 
| Manufacturer information: | |
| Wafer position: | C15 | 
| Break-through voltage: | 442 V | 
| Voltage for Gain 100 (T=+25°C): | 416.8 V | 
| Dark current: | 9.4 nA | 
| Screening Logistics: | |
| Available: | Yes | 
| Storage Box: | 35 | 
| Position in Box: | 32 | 
| EP1 batch: | none | 
| EP1 batch after irradiation: | none | 
| Shipment: | |
| Grid number: | 349 | 
| Position in grid: | 1 | 
| Arrival for irradiation: | 29. Sep 2017 | 
| Sent for analysis after irradiation: | 03. Jan 2019 | 
| Return for assembly: | none | 
| Irradiation: | |
| Date: | 05. Dec 2018 | 
| Dose used: | 37 Gy | 
| Temperature: | 20 °C | 
| Position: | none | 
| Bias voltage: | none | 
| Annealing: | |
| Date: | 10. Dec 2018 | 
| Temperature: | 80 °C | 
| Duration: | 48 h | 
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 416.0504372 V T = -25 °C: 379.2028724 V | 
| Voltage for Gain 150: | T = +20 °C: 424.0779563 V T = -25 °C: 387.1039746 V | 
| Voltage for Gain 200: | T = +20 °C: 428.4512203 V T = -25 °C: 391.5297725 V | 
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.489745547 V-1 T = -25 °C: 4.909201783 V-1 | 
| Gain/Voltage slope at M = 150: | T = +20 °C: 9.487833857 V-1 T = -25 °C: 9.016779193 V-1 | 
| Gain/Voltage slope at M = 200: | T = +20 °C: 14.59404594 V-1 T = -25 °C: 13.90832893 V-1 | 
| Break-through voltage: | T = +20 °C: 439.443102 V T = -25 °C: 405.1389205 V | 
| Notes: | 
						
					
Version history
| Time | Author | Change comment | 
|---|---|---|
| 05. Feb 2021 10:52:32 CET | jreher | Updated box and position via API. | 
| 03. Feb 2021 18:18:29 CET | jreher | Updated box and position via API. | 
| 07. Oct 2020 15:45:57 CEST | jreher | Updated APD location via API. | 
| 11. Aug 2020 17:25:25 CEST | jreher | Updated APD characteristics via API. | 
| 28. Nov 2019 12:22:49 CET | jreher | Updated APD location via API. | 
| 25. Nov 2019 17:13:39 CET | jreher | Updated box and position via API. | 
| 13. Jun 2019 11:29:30 CEST | jreher | Updated APD location via API. | 
| 12. Jun 2019 16:48:02 CEST | jreher | Updated APD batch assignment via API. | 
| 12. Jun 2019 16:32:57 CEST | jreher | Updated APD batch assignment via API. | 
| 03. Jan 2019 14:23:04 CET | markus.moritz | |
| 29. Sep 2017 11:21:57 CEST | markus.moritz | Entered arrival for irradiation date. | 
| 01. Aug 2016 17:28:57 CEST | Tobias | Assigned to grid via information extracted from APD DB. | 
| 23. Jun 2016 10:29:49 CEST | Tobias | Imported from Hamamatsu datasheet. | 
 
						 
					