RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1317014838 - Archived data from Wed, 07. October 2020 15:44:57 CEST


This is all the information about APD 1317014838. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1317014838
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 434 V
Voltage for Gain 100 (T=+25°C): 405.9 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 292
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 345
Position in grid: 3
Arrival for irradiation: 19. Sep 2016
Sent for analysis after irradiation: 30. Sep 2016
Return for assembly: 02. Nov 2016
   
Irradiation:  
Date: 27. Sep 2016
Dose used: 36 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: 28. Sep 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 406.1670235 V     T = -25 °C: 369.3216934 V
Voltage for Gain 150: T = +20 °C: 414.1527222 V     T = -25 °C: 377.209228 V
Voltage for Gain 200: T = +20 °C: 418.5835242 V     T = -25 °C: 381.5960162 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.469340551 V-1     T = -25 °C: 4.462037549 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.756115319 V-1     T = -25 °C: 8.77285611 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.22835476 V-1     T = -25 °C: 15.32516361 V-1
Break-through voltage: T = +20 °C: 433.1994966 V     T = -25 °C: 396.7646935 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:58 CET jreher Updated box and position via API.
07. Oct 2020 15:44:57 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:41 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:01 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:11 CET jreher Updated APD location via API.
25. Nov 2019 17:31:37 CET jreher Updated box and position via API.
22. Oct 2019 14:33:20 CEST spankonin Updated APD location via API.
15. Oct 2019 11:00:18 CEST jgrochowski Updated APD batch assignment via API.
02. Nov 2016 14:38:26 CET markus.moritz Entered return for assembly date.
07. Oct 2016 10:48:56 CEST christopher.l.hahn Entered irradiation information.
05. Oct 2016 15:42:51 CEST markus.moritz Entered shipped after irradiation date.
28. Sep 2016 14:01:44 CEST christopher.l.hahn Entered annealing information.
27. Sep 2016 18:02:40 CEST christopher.l.hahn Entered irradiation information.
23. Sep 2016 09:10:33 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:54 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:47 CEST Tobias Imported from Hamamatsu datasheet.