RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1316014744 - Archived data from Fri, 16. April 2021 10:28:50 CEST


This is all the information about APD 1316014744. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1316014744
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 441 V
Voltage for Gain 100 (T=+25°C): 412.7 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 416
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 341
Position in grid: 18
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 20. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 412.7 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:09:00 CEST jreher Updated APD characteristics via API.
16. Apr 2021 10:28:50 CEST jreher Updated APD location via API.
31. Mar 2021 14:14:54 CEST jreher Updated box and position via API.
26. Feb 2021 15:44:44 CET jreher Updated APD batch assignment via API.
03. Feb 2021 18:07:12 CET jreher Updated APD location via API.
20. Oct 2017 14:31:24 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:49:14 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:54:49 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:52 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:45 CEST Tobias Imported from Hamamatsu datasheet.