RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1316014706 - Archived data from Fri, 05. February 2021 11:34:42 CET


This is all the information about APD 1316014706. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1316014706
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 439 V
Voltage for Gain 100 (T=+25°C): 410.3 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 362
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 340
Position in grid: 2
Arrival for irradiation: 02. Nov 2017
Sent for analysis after irradiation: 23. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 410.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:01:42 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:34:42 CET jreher Updated box and position via API.
08. Oct 2020 18:16:30 CEST jreher Updated APD location via API.
08. Sep 2020 17:20:17 CEST vwerner Updated APD batch assignment via API.
23. Nov 2017 11:59:55 CET markus.moritz Entered shipped after irradiation date.
23. Nov 2017 11:55:37 CET markus.moritz Entered irradiation information.
02. Nov 2017 15:19:06 CET markus.moritz Entered arrival for irradiation date.
27. Oct 2017 10:23:25 CEST Tobias Resetted arrival for irradiation date as APDs are returned to GSI un-irradiated.
29. Sep 2017 12:33:10 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:51 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:44 CEST Tobias Imported from Hamamatsu datasheet.