RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1315014679 - Archived data from Wed, 07. October 2020 15:45:57 CEST


This is all the information about APD 1315014679. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1315014679
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 443 V
Voltage for Gain 100 (T=+25°C): 414 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 35
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 338
Position in grid: 17
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 414.6523537 V     T = -25 °C: 377.8662928 V
Voltage for Gain 150: T = +20 °C: 422.6492943 V     T = -25 °C: 385.8034937 V
Voltage for Gain 200: T = +20 °C: 427.0261305 V     T = -25 °C: 390.21467 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.759709633 V-1     T = -25 °C: 4.394009209 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.292145107 V-1     T = -25 °C: 8.712491102 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.73379861 V-1     T = -25 °C: 14.85181804 V-1
Break-through voltage: T = +20 °C: 439.8387955 V     T = -25 °C: 405.8248656 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:29 CET jreher Updated box and position via API.
03. Feb 2021 18:18:29 CET jreher Updated box and position via API.
07. Oct 2020 15:45:57 CEST jreher Updated APD location via API.
11. Aug 2020 17:25:24 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:49 CET jreher Updated APD location via API.
25. Nov 2019 17:13:39 CET jreher Updated box and position via API.
13. Jun 2019 11:29:29 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:01 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:57 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 13:22:30 CET markus.moritz
29. Sep 2017 10:21:51 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:50 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:43 CEST Tobias Imported from Hamamatsu datasheet.