RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1315014663 - Archived data from Wed, 03. February 2021 18:18:28 CET


This is all the information about APD 1315014663. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1315014663
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 440 V
Voltage for Gain 100 (T=+25°C): 411.9 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 35
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 338
Position in grid: 5
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 412.0891252 V     T = -25 °C: 375.4279874 V
Voltage for Gain 150: T = +20 °C: 420.07765 V     T = -25 °C: 383.3819059 V
Voltage for Gain 200: T = +20 °C: 424.5304249 V     T = -25 °C: 387.7385662 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.623665353 V-1     T = -25 °C: 4.416321588 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.792480188 V-1     T = -25 °C: 9.492183346 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.54519491 V-1     T = -25 °C: 14.99660716 V-1
Break-through voltage: T = +20 °C: 439.6945085 V     T = -25 °C: 403.171932 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:26 CET jreher Updated box and position via API.
03. Feb 2021 18:18:28 CET jreher Updated box and position via API.
07. Oct 2020 15:45:56 CEST jreher Updated APD location via API.
11. Aug 2020 17:25:22 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:48 CET jreher Updated APD location via API.
25. Nov 2019 17:13:38 CET jreher Updated box and position via API.
13. Jun 2019 11:29:29 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:01 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:56 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 13:19:13 CET markus.moritz
29. Sep 2017 10:21:51 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:49 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:43 CEST Tobias Imported from Hamamatsu datasheet.