RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1315014640 - Archived data from Tue, 11. August 2020 17:40:50 CEST


This is all the information about APD 1315014640. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1315014640
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 441 V
Voltage for Gain 100 (T=+25°C): 412.4 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 293
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 337
Position in grid: 4
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 350 V     (not connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 413.2633702 V     T = -25 °C: 376.931395 V
Voltage for Gain 150: T = +20 °C: 421.1525213 V     T = -25 °C: 384.6975734 V
Voltage for Gain 200: T = +20 °C: 425.5497361 V     T = -25 °C: 389.0112417 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.487044715 V-1     T = -25 °C: 4.694431063 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.801051219 V-1     T = -25 °C: 9.329072072 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.27278829 V-1     T = -25 °C: 14.60273285 V-1
Break-through voltage: T = +20 °C: 439.9355687 V     T = -25 °C: 404.7260133 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:05 CET jreher Updated box and position via API.
11. Aug 2020 17:40:50 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:11 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:22 CET jreher Updated APD location via API.
25. Nov 2019 17:31:41 CET jreher Updated box and position via API.
11. Nov 2019 15:43:04 CET spankonin Updated APD location via API.
15. Oct 2019 10:59:40 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:28:48 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:31:08 CET markus.moritz Entered shipped after irradiation date.
02. Nov 2016 14:16:10 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:05:42 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:44 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:42 CEST Tobias Imported from Hamamatsu datasheet.