RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0915010085 - Archived data from Tue, 11. August 2020 17:26:55 CEST


This is all the information about APD 0915010085. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0915010085
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.1 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 44
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 223
Position in grid: 6
Arrival for irradiation: 01. Jul 2016
Sent for analysis after irradiation: 08. Jul 2016
Return for assembly: 12. Sep 2016
   
Irradiation:  
Date: 05. Jul 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 4
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 05. Jul 2016
Temperature: 80 °C
Duration: 8 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.9556111 V     T = -25 °C: 342.508504 V
Voltage for Gain 150: T = +20 °C: 385.795034 V     T = -25 °C: 349.7798164 V
Voltage for Gain 200: T = +20 °C: 390.1581882 V     T = -25 °C: 353.8730054 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.540555875 V-1     T = -25 °C: 4.685789153 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.526887292 V-1     T = -25 °C: 9.706235096 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.05955916 V-1     T = -25 °C: 15.36440835 V-1
Break-through voltage: T = +20 °C: 405.620512 V     T = -25 °C: 368.7399388 V
   
Notes:


Version history

Time Author Change comment
22. Feb 2021 11:10:51 CET jreher Updated box and position via API.
05. Feb 2021 10:53:53 CET jreher Updated box and position via API.
03. Feb 2021 18:19:41 CET jreher Updated box and position via API.
08. Dec 2020 17:17:17 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:01 CEST jreher Updated box and position via API.
11. Aug 2020 17:26:55 CEST jreher Updated APD characteristics via API.
04. Aug 2020 15:48:20 CEST jreher Updated box and position via API.
27. Nov 2019 19:36:50 CET jreher Updated APD location via API.
25. Nov 2019 17:14:26 CET jreher Updated box and position via API.
04. Jul 2019 11:11:37 CEST jreher Updated APD location via API.
13. Jun 2019 10:01:30 CEST jreher Updated APD batch assignment via API.
12. Sep 2016 09:51:55 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:41:04 CEST markus.moritz Entered irradiation information.
03. Aug 2016 16:15:32 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:15:21 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 14:56:29 CEST christopher.l.hahn Entered annealing information.
01. Aug 2016 17:27:33 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:26:44 CEST Tobias Imported from Hamamatsu datasheet.