RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1309014225 - Archived data from Wed, 07. October 2020 15:44:53 CEST


This is all the information about APD 1309014225. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1309014225
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 443 V
Voltage for Gain 100 (T=+25°C): 414.5 V
Dark current: 8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 291
Position in Box: 21
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 319
Position in grid: 2
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 415.2161558 V     T = -25 °C: 378.6891775 V
Voltage for Gain 150: T = +20 °C: 423.1323232 V     T = -25 °C: 386.5277827 V
Voltage for Gain 200: T = +20 °C: 427.5299378 V     T = -25 °C: 390.8599525 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.480735292 V-1     T = -25 °C: 4.692300923 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.745409562 V-1     T = -25 °C: 8.543377065 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.21191314 V-1     T = -25 °C: 14.91408436 V-1
Break-through voltage: T = +20 °C: 437.5403825 V     T = -25 °C: 406.5033835 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:51 CET jreher Updated box and position via API.
07. Oct 2020 15:44:53 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:31 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:51 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:01 CET jreher Updated APD location via API.
25. Nov 2019 17:31:33 CET jreher Updated box and position via API.
22. Oct 2019 14:32:45 CEST spankonin Updated APD location via API.
15. Oct 2019 11:01:03 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:29:03 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:42 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:00:23 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:52:38 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:36 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:29 CEST Tobias Imported from Hamamatsu datasheet.