Show Hamamatsu Avalanche Photo Diode 1309014219 - Archived data from Thu, 08. October 2020 18:16:00 CEST
					This is all the information about APD 1309014219. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 1309014219 | 
| Type: | Hamamatsu Avalanche Photo Diode | 
| Detector: | unassigned | 
| Unit: | unassigned | 
| Preamp: | 0 | 
| Current location: | Bochum | 
| Installation information: | |
| Label: | none | 
| Manufacturer information: | |
| Wafer position: | E02 | 
| Break-through voltage: | 441 V | 
| Voltage for Gain 100 (T=+25°C): | 412.5 V | 
| Dark current: | 8.6 nA | 
| Screening Logistics: | |
| Available: | Yes | 
| Storage Box: | 359 | 
| Position in Box: | 44 | 
| EP1 batch: | none | 
| EP1 batch after irradiation: | none | 
| Shipment: | |
| Grid number: | 318 | 
| Position in grid: | 16 | 
| Arrival for irradiation: | 02. Nov 2016 | 
| Sent for analysis after irradiation: | 10. Nov 2016 | 
| Return for assembly: | 09. Dec 2016 | 
| Irradiation: | |
| Date: | 04. Nov 2016 | 
| Dose used: | 30 Gy | 
| Temperature: | 20 °C | 
| Position: | 1 | 
| Bias voltage: | 412.5 V (connected) | 
| Annealing: | |
| Date: | none | 
| Temperature: | none | 
| Duration: | none | 
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none | 
| Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none | 
| Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none | 
| Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none | 
| Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none | 
| Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none | 
| Break-through voltage: | T = +20 °C: none T = -25 °C: none | 
| Notes: | 
						
					
Version history
| Time | Author | Change comment | 
|---|---|---|
| 16. Apr 2021 22:01:33 CEST | jreher | Updated APD characteristics via API. | 
| 05. Feb 2021 11:34:23 CET | jreher | Updated box and position via API. | 
| 08. Oct 2020 18:16:00 CEST | jreher | Updated APD location via API. | 
| 08. Sep 2020 16:49:04 CEST | vwerner | Updated APD batch assignment via API. | 
| 09. Dec 2016 10:28:26 CET | markus.moritz | Entered return for assembly date. | 
| 23. Nov 2016 13:24:00 CET | markus.moritz | Entered shipped after irradiation date. | 
| 23. Nov 2016 13:23:08 CET | markus.moritz | Entered irradiation information. | 
| 02. Nov 2016 14:51:49 CET | markus.moritz | Entered arrival for irradiation date. | 
| 01. Aug 2016 17:28:36 CEST | Tobias | Assigned to grid via information extracted from APD DB. | 
| 22. Jun 2016 15:42:29 CEST | Tobias | Imported from Hamamatsu datasheet. | 
 
						 
					