Show Hamamatsu Avalanche Photo Diode 1308014146 - Archived data from Tue, 11. August 2020 17:40:21 CEST
					This is all the information about APD 1308014146. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 1308014146 | 
| Type: | Hamamatsu Avalanche Photo Diode | 
| Detector: | unassigned | 
| Unit: | unassigned | 
| Preamp: | 0 | 
| Current location: | Bochum | 
| Installation information: | |
| Label: | none | 
| Manufacturer information: | |
| Wafer position: | B07 | 
| Break-through voltage: | 437.6 V | 
| Voltage for Gain 100 (T=+25°C): | 409.6 V | 
| Dark current: | 7.01 nA | 
| Screening Logistics: | |
| Available: | Yes | 
| Storage Box: | 290 | 
| Position in Box: | 18 | 
| EP1 batch: | none | 
| EP1 batch after irradiation: | none | 
| Shipment: | |
| Grid number: | 315 | 
| Position in grid: | 10 | 
| Arrival for irradiation: | 02. Nov 2016 | 
| Sent for analysis after irradiation: | 10. Nov 2016 | 
| Return for assembly: | 09. Dec 2016 | 
| Irradiation: | |
| Date: | 04. Nov 2016 | 
| Dose used: | 30 Gy | 
| Temperature: | 20 °C | 
| Position: | 2 | 
| Bias voltage: | 350 V (connected) | 
| Annealing: | |
| Date: | none | 
| Temperature: | none | 
| Duration: | none | 
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 410.6362587 V T = -25 °C: 373.7055999 V | 
| Voltage for Gain 150: | T = +20 °C: 418.5715478 V T = -25 °C: 381.6735491 V | 
| Voltage for Gain 200: | T = +20 °C: 422.9598827 V T = -25 °C: 386.1070939 V | 
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.426192412 V-1 T = -25 °C: 4.67199215 V-1 | 
| Gain/Voltage slope at M = 150: | T = +20 °C: 9.329592404 V-1 T = -25 °C: 8.84129761 V-1 | 
| Gain/Voltage slope at M = 200: | T = +20 °C: 15.30469812 V-1 T = -25 °C: 14.18379544 V-1 | 
| Break-through voltage: | T = +20 °C: 437.2944298 V T = -25 °C: 401.6082875 V | 
| Notes: | 
						
					
Version history
| Time | Author | Change comment | 
|---|---|---|
| 05. Feb 2021 11:25:42 CET | jreher | Updated box and position via API. | 
| 11. Aug 2020 17:40:21 CEST | jreher | Updated APD characteristics via API. | 
| 21. Jul 2020 14:40:41 CEST | jreher | Updated box and position via API. | 
| 27. Nov 2019 20:18:49 CET | jreher | Updated APD location via API. | 
| 25. Nov 2019 17:31:28 CET | jreher | Updated box and position via API. | 
| 22. Oct 2019 14:31:59 CEST | spankonin | Updated APD location via API. | 
| 14. Oct 2019 17:31:24 CEST | jgrochowski | Updated APD batch assignment via API. | 
| 09. Dec 2016 10:27:10 CET | markus.moritz | Entered return for assembly date. | 
| 23. Nov 2016 10:53:26 CET | markus.moritz | Entered shipped after irradiation date. | 
| 04. Nov 2016 16:05:31 CET | markus.moritz | Entered irradiation information. | 
| 02. Nov 2016 14:51:22 CET | markus.moritz | Entered arrival for irradiation date. | 
| 01. Aug 2016 17:28:34 CEST | Tobias | Assigned to grid via information extracted from APD DB. | 
| 22. Jun 2016 15:41:07 CEST | Tobias | Imported from Hamamatsu datasheet. |