Subdetector specification:  
Serial: 1306014000
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 432.8 V
Voltage for Gain 100 (T=+25°C): 404.8 V
Dark current: 8.09 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 290
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 308
Position in grid: 18
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: 29. Nov 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 406.2862265 V     T = -25 °C: 369.3885726 V
Voltage for Gain 150: T = +20 °C: 414.2471898 V     T = -25 °C: 377.2366232 V
Voltage for Gain 200: T = +20 °C: 418.6542862 V     T = -25 °C: 381.5964994 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.443951204 V-1     T = -25 °C: 4.464921733 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.710006381 V-1     T = -25 °C: 8.784354061 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.12788739 V-1     T = -25 °C: 15.42045558 V-1
Break-through voltage: T = +20 °C: 432.8937046 V     T = -25 °C: 395.974486 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:45 CET jreher Updated box and position via API.
11. Aug 2020 17:40:26 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:43 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:52 CET jreher Updated APD location via API.
25. Nov 2019 17:31:30 CET jreher Updated box and position via API.
22. Oct 2019 14:32:01 CEST spankonin Updated APD location via API.
15. Oct 2019 11:02:54 CEST jgrochowski Updated APD batch assignment via API.
29. Nov 2016 11:51:20 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:30:38 CET markus.moritz Entered shipped after irradiation date.
02. Nov 2016 14:18:52 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:06:20 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:29 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:03 CEST Tobias Imported from Hamamatsu datasheet.