Show Hamamatsu Avalanche Photo Diode 1306013999 - Archived data from Tue, 11. August 2020 17:40:51 CEST
This is all the information about APD 1306013999. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 1306013999 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | C14 |
| Break-through voltage: | 445.1 V |
| Voltage for Gain 100 (T=+25°C): | 416.5 V |
| Dark current: | 12.8 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 293 |
| Position in Box: | 17 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | 308 |
| Position in grid: | 17 |
| Arrival for irradiation: | 27. Oct 2016 |
| Sent for analysis after irradiation: | 02. Nov 2016 |
| Return for assembly: | 29. Nov 2016 |
| Irradiation: | |
| Date: | 31. Oct 2016 |
| Dose used: | 30 Gy |
| Temperature: | 20 °C |
| Position: | 2 |
| Bias voltage: | 350 V (not connected) |
| Annealing: | |
| Date: | none |
| Temperature: | none |
| Duration: | none |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 417.2774541 V T = -25 °C: 380.014043 V |
| Voltage for Gain 150: | T = +20 °C: 425.2300448 V T = -25 °C: 387.9628199 V |
| Voltage for Gain 200: | T = +20 °C: 429.6251062 V T = -25 °C: 392.4014709 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.421653618 V-1 T = -25 °C: 4.540627712 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 8.649065826 V-1 T = -25 °C: 8.936196552 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 15.07022645 V-1 T = -25 °C: 13.6279244 V-1 |
| Break-through voltage: | T = +20 °C: 440.0007079 V T = -25 °C: 408.7664122 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 11:26:06 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:40:51 CEST | jreher | Updated APD characteristics via API. |
| 21. Jul 2020 14:41:11 CEST | jreher | Updated box and position via API. |
| 27. Nov 2019 20:19:22 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:31:42 CET | jreher | Updated box and position via API. |
| 11. Nov 2019 15:43:04 CET | spankonin | Updated APD location via API. |
| 15. Oct 2019 10:59:40 CEST | jgrochowski | Updated APD batch assignment via API. |
| 29. Nov 2016 11:51:20 CET | markus.moritz | Entered return for assembly date. |
| 02. Nov 2016 14:30:38 CET | markus.moritz | Entered shipped after irradiation date. |
| 02. Nov 2016 14:18:52 CET | markus.moritz | Entered irradiation information. |
| 27. Oct 2016 12:06:20 CEST | markus.moritz | Entered arrival for irradiation date. |
| 01. Aug 2016 17:28:29 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
| 22. Jun 2016 15:41:03 CEST | Tobias | Imported from Hamamatsu datasheet. |