RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1306013956 - Archived data from Tue, 11. August 2020 17:40:24 CEST


This is all the information about APD 1306013956. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1306013956
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 438.6 V
Voltage for Gain 100 (T=+25°C): 411 V
Dark current: 11.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 290
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 306
Position in grid: 12
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: 20. Dec 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 411.5674544 V     T = -25 °C: 375.0653215 V
Voltage for Gain 150: T = +20 °C: 419.497697 V     T = -25 °C: 382.9206823 V
Voltage for Gain 200: T = +20 °C: 423.888393 V     T = -25 °C: 387.2850427 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.350546671 V-1     T = -25 °C: 4.545873304 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.423892634 V-1     T = -25 °C: 8.992912923 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52514387 V-1     T = -25 °C: 13.92555913 V-1
Break-through voltage: T = +20 °C: 432.8678492 V     T = -25 °C: 403.1868554 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:44 CET jreher Updated box and position via API.
11. Aug 2020 17:40:24 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:42 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:50 CET jreher Updated APD location via API.
25. Nov 2019 17:31:29 CET jreher Updated box and position via API.
22. Oct 2019 14:32:00 CEST spankonin Updated APD location via API.
15. Oct 2019 11:02:53 CEST jgrochowski Updated APD batch assignment via API.
20. Dec 2016 10:39:41 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:30:30 CET markus.moritz Entered shipped after irradiation date.
02. Nov 2016 14:19:18 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:06:35 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:28 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:01 CEST Tobias Imported from Hamamatsu datasheet.