RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1208013295 - Archived data from Tue, 11. August 2020 17:40:15 CEST


This is all the information about APD 1208013295. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1208013295
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 431 V
Voltage for Gain 100 (T=+25°C): 402.2 V
Dark current: 11.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 289
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 277
Position in grid: 13
Arrival for irradiation: 11. Jul 2016
Sent for analysis after irradiation: 15. Jul 2016
Return for assembly: 19. Sep 2016
   
Irradiation:  
Date: 13. Jul 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 2
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 13. Jul 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 403.055279 V     T = -25 °C: 365.611913 V
Voltage for Gain 150: T = +20 °C: 411.0512974 V     T = -25 °C: 373.6046705 V
Voltage for Gain 200: T = +20 °C: 415.4741472 V     T = -25 °C: 378.0296611 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.354751367 V-1     T = -25 °C: 4.446288671 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.085023287 V-1     T = -25 °C: 9.080833479 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.83256783 V-1     T = -25 °C: 15.50716477 V-1
Break-through voltage: T = +20 °C: 432.0940001 V     T = -25 °C: 394.4740348 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:37 CET jreher Updated box and position via API.
07. Oct 2020 15:44:50 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:15 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:32 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:40 CET jreher Updated APD location via API.
25. Nov 2019 17:31:25 CET jreher Updated box and position via API.
22. Oct 2019 14:31:16 CEST spankonin Updated APD location via API.
14. Oct 2019 17:31:22 CEST jgrochowski Updated APD batch assignment via API.
23. Sep 2016 09:05:21 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:35:16 CEST markus.moritz Entered irradiation information.
03. Aug 2016 16:18:04 CEST markus.moritz Entered shipped after irradiation date.
02. Aug 2016 14:59:16 CEST christopher.l.hahn Entered annealing information.
02. Aug 2016 10:45:08 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:09 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:36 CEST Tobias Imported from Hamamatsu datasheet.