RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1207013229 - Archived data from Wed, 07. October 2020 15:44:49 CEST


This is all the information about APD 1207013229. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1207013229
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 439 V
Voltage for Gain 100 (T=+25°C): 412.5 V
Dark current: 8.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 289
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 274
Position in grid: 18
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 22. Feb 2018
Dose used: 30 Gy
Temperature: 25 °C
Position: 3
Bias voltage: 0 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 412.7913391 V     T = -25 °C: 375.9916726 V
Voltage for Gain 150: T = +20 °C: 420.7439039 V     T = -25 °C: 383.8811097 V
Voltage for Gain 200: T = +20 °C: 425.1489666 V     T = -25 °C: 388.2552321 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.61792347 V-1     T = -25 °C: 4.577888048 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.115767531 V-1     T = -25 °C: 9.088968497 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.26681563 V-1     T = -25 °C: 14.12910024 V-1
Break-through voltage: T = +20 °C: 438.5097542 V     T = -25 °C: 402.1954981 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:35 CET jreher Updated box and position via API.
07. Oct 2020 15:44:49 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:12 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:31 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:39 CET jreher Updated APD location via API.
25. Nov 2019 17:31:24 CET jreher Updated box and position via API.
22. Oct 2019 14:31:15 CEST spankonin Updated APD location via API.
14. Oct 2019 17:33:22 CEST jgrochowski Updated APD batch assignment via API.
05. Apr 2018 12:28:45 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:29:51 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:07 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:35 CEST Tobias Imported from Hamamatsu datasheet.