Show Hamamatsu Avalanche Photo Diode 1206013085 - Archived data from Wed, 03. February 2021 18:19:44 CET


This is all the information about APD 1206013085. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1206013085
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 436 V
Voltage for Gain 100 (T=+25°C): 407.1 V
Dark current: 9.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 45
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 267
Position in grid: 18
Arrival for irradiation: 11. Jul 2016
Sent for analysis after irradiation: 15. Jul 2016
Return for assembly: 19. Sep 2016
   
Irradiation:  
Date: 13. Jul 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 13. Jul 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 407.9857656 V     T = -25 °C: 370.892831 V
Voltage for Gain 150: T = +20 °C: 415.9277422 V     T = -25 °C: 378.7727314 V
Voltage for Gain 200: T = +20 °C: 420.3406343 V     T = -25 °C: 383.1502147 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.679464239 V-1     T = -25 °C: 4.72337423 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.049803174 V-1     T = -25 °C: 9.121527478 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.91438857 V-1     T = -25 °C: 14.3069594 V-1
Break-through voltage: T = +20 °C: 436.1061582 V     T = -25 °C: 399.0503446 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:56 CET jreher Updated box and position via API.
03. Feb 2021 18:19:44 CET jreher Updated box and position via API.
07. Oct 2020 15:46:03 CEST jreher Updated APD location via API.
11. Aug 2020 17:26:57 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:58 CET jreher Updated APD location via API.
25. Nov 2019 17:14:28 CET jreher Updated box and position via API.
04. Jul 2019 11:11:43 CEST jreher Updated APD location via API.
13. Jun 2019 10:01:32 CEST jreher Updated APD batch assignment via API.
23. Sep 2016 09:05:44 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:36:53 CEST markus.moritz Entered irradiation information.
02. Aug 2016 15:00:12 CEST christopher.l.hahn Entered annealing information.
02. Aug 2016 10:44:37 CEST markus.moritz Entered shipped after irradiation date.
02. Aug 2016 10:43:54 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:02 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:31 CEST Tobias Imported from Hamamatsu datasheet.