RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1203012899 - Archived data from Wed, 07. October 2020 15:45:06 CEST


This is all the information about APD 1203012899. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1203012899
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B13
Break-through voltage: 445 V
Voltage for Gain 100 (T=+25°C): 417.3 V
Dark current: 12 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 304
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 259
Position in grid: 2
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 417.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 417.3026396 V     T = -25 °C: 380.5111396 V
Voltage for Gain 150: T = +20 °C: 425.2518859 V     T = -25 °C: 388.4172231 V
Voltage for Gain 200: T = +20 °C: 429.676877 V     T = -25 °C: 392.8068183 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.453901013 V-1     T = -25 °C: 4.411220784 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.682405801 V-1     T = -25 °C: 8.62959262 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.17566366 V-1     T = -25 °C: 14.978903 V-1
Break-through voltage: T = +20 °C: 438.6091635 V     T = -25 °C: 408.4923191 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:30 CET jreher Updated box and position via API.
07. Oct 2020 15:45:06 CEST jreher Updated APD location via API.
11. Aug 2020 17:57:48 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:54 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:45 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:59 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:20 CET jreher Updated box and position via API.
20. Oct 2017 14:31:15 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:54:14 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:51:47 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:27:56 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:37:52 CEST Tobias Imported from Hamamatsu datasheet.