RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1201012774 - Archived data from Tue, 11. August 2020 17:57:52 CEST


This is all the information about APD 1201012774. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1201012774
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 440 V
Voltage for Gain 100 (T=+25°C): 412 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 304
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 253
Position in grid: 16
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 412 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 412.8545524 V     T = -25 °C: 376.0560164 V
Voltage for Gain 150: T = +20 °C: 420.9070181 V     T = -25 °C: 383.9971453 V
Voltage for Gain 200: T = +20 °C: 425.3797733 V     T = -25 °C: 388.4040625 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.5495953 V-1     T = -25 °C: 4.551516197 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.843751469 V-1     T = -25 °C: 8.933641864 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.60397652 V-1     T = -25 °C: 13.75800929 V-1
Break-through voltage: T = +20 °C: 439.9065997 V     T = -25 °C: 403.5085176 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:32 CET jreher Updated box and position via API.
07. Oct 2020 15:45:08 CEST jreher Updated APD location via API.
11. Aug 2020 17:57:52 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:56 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:46 CEST jreher Updated box and position via API.
19. Dec 2019 16:20:00 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:22 CET jreher Updated box and position via API.
27. Oct 2017 10:38:42 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:29:49 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:53:38 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:27:52 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:37:48 CEST Tobias Imported from Hamamatsu datasheet.