RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0924010714 - Archived data from Fri, 05. February 2021 11:27:37 CET


This is all the information about APD 0924010714. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0924010714
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.8 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 305
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 250
Position in grid: 6
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 19. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 384.8 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.0977474 V     T = -25 °C: 350.3335243 V
Voltage for Gain 150: T = +20 °C: 394.0309109 V     T = -25 °C: 357.8024381 V
Voltage for Gain 200: T = +20 °C: 398.4463894 V     T = -25 °C: 362.0066309 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.526477813 V-1     T = -25 °C: 4.731425229 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.831913729 V-1     T = -25 °C: 9.548269194 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.48424865 V-1     T = -25 °C: 14.97943536 V-1
Break-through voltage: T = +20 °C: 412.4013742 V     T = -25 °C: 376.2379662 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:27:28 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:44 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:27:37 CET jreher Updated box and position via API.
11. Aug 2020 17:57:58 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:09 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:00 CEST jreher Updated box and position via API.
19. Dec 2019 16:20:26 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:27 CET jreher Updated box and position via API.
20. Oct 2017 14:31:03 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:53:08 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:27:31 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:27:31 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:37:46 CEST Tobias Imported from Hamamatsu datasheet.