RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0911009765 - Archived data from Mon, 25. November 2019 17:14:27 CET


This is all the information about APD 0911009765. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0911009765
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 44
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 44
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 208
Position in grid: 19
Arrival for irradiation: 12. Jul 2016
Sent for analysis after irradiation: 22. Jul 2016
Return for assembly: 19. Sep 2016
   
Irradiation:  
Date: 12. Jul 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 4
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 12. Jul 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
17. Apr 2021 01:10:33 CEST jreher Updated APD location via API.
22. Feb 2021 11:10:51 CET jreher Updated box and position via API.
05. Feb 2021 10:53:54 CET jreher Updated box and position via API.
03. Feb 2021 18:19:41 CET jreher Updated box and position via API.
11. Aug 2020 17:26:56 CEST jreher Updated APD characteristics via API.
04. Aug 2020 15:48:20 CEST jreher Updated box and position via API.
27. Nov 2019 19:36:51 CET jreher Updated APD location via API.
25. Nov 2019 17:14:27 CET jreher Updated box and position via API.
04. Jul 2019 11:11:38 CEST jreher Updated APD location via API.
13. Jun 2019 10:01:31 CEST jreher Updated APD batch assignment via API.
23. Sep 2016 09:06:01 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:11:23 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:10:59 CEST markus.moritz Entered arrival for irradiation date.
03. Aug 2016 10:52:06 CEST tobias Repaired loop-off-by-1 error in save script.
03. Aug 2016 10:37:32 CEST tobias Repaired loop-off-by-1 error in save script.
01. Aug 2016 17:27:44 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:34:21 CEST Tobias Imported from Hamamatsu datasheet.