RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0910009729 - Archived data from Tue, 16. February 2021 12:28:33 CET


This is all the information about APD 0910009729. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0910009729
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.4 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 44
Position in Box: 39
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 207
Position in grid: 8
Arrival for irradiation: 15. May 2016
Sent for analysis after irradiation: 23. Jun 2016
Return for assembly: 20. Dec 2016
   
Irradiation:  
Date: 20. May 2016
Dose used: 57 Gy
Temperature: -25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 20. May 2016
Temperature: 80 °C
Duration: 8 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.9941559 V     T = -25 °C: 349.9336762 V
Voltage for Gain 150: T = +20 °C: 393.9453642 V     T = -25 °C: 357.4544514 V
Voltage for Gain 200: T = +20 °C: 398.3679547 V     T = -25 °C: 361.7026993 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.385481606 V-1     T = -25 °C: 4.69224367 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.13411914 V-1     T = -25 °C: 9.103207968 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.79399414 V-1     T = -25 °C: 15.39048488 V-1
Break-through voltage: T = +20 °C: 413.8481372 V     T = -25 °C: 376.9641117 V
   
Notes: has been irradiated and annealed again (sent to Gießen on 24_07_2018, irradiated on 16_08_2018 with 30Gy at 20°C, annealed on 17_08_2018 at 80°C for 48h, sent to analysis on 21_08_2018)


Version history

Time Author Change comment
14. Apr 2021 14:20:35 CEST jreher Assigned to capsule by script
22. Feb 2021 11:10:50 CET jreher Updated box and position via API.
16. Feb 2021 12:28:33 CET jreher Updated box and position via API.
05. Feb 2021 10:53:53 CET jreher Updated box and position via API.
03. Feb 2021 18:19:40 CET jreher Updated box and position via API.
11. Aug 2020 17:26:54 CEST jreher Updated APD characteristics via API.
04. Aug 2020 15:48:20 CEST jreher Updated box and position via API.
27. Nov 2019 19:36:50 CET jreher Updated APD location via API.
25. Nov 2019 17:14:26 CET jreher Updated box and position via API.
04. Jul 2019 11:11:37 CEST jreher Updated APD location via API.
13. Jun 2019 10:01:14 CEST jreher Updated APD batch assignment via API.
21. Aug 2018 11:47:52 CEST markus.moritz
20. Dec 2016 10:37:11 CET markus.moritz Entered return for assembly date.
03. Aug 2016 16:10:39 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:10:26 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 16:26:46 CEST markus.moritz Entered irradiation information.
02. Aug 2016 15:17:47 CEST christopher.l.hahn Entered annealing information.
01. Aug 2016 17:52:06 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:34:20 CEST Tobias Imported from Hamamatsu datasheet.