RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0909009657 - Archived data from Fri, 05. February 2021 11:27:37 CET


This is all the information about APD 0909009657. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0909009657
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 305
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 203
Position in grid: 19
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 383.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.6070928 V     T = -25 °C: 347.9054207 V
Voltage for Gain 150: T = +20 °C: 391.6021255 V     T = -25 °C: 355.3846047 V
Voltage for Gain 200: T = +20 °C: 396.0364629 V     T = -25 °C: 359.5911359 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.354778861 V-1     T = -25 °C: 4.925019592 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.201330545 V-1     T = -25 °C: 9.021067399 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.25835348 V-1     T = -25 °C: 15.78066754 V-1
Break-through voltage: T = +20 °C: 411.7713372 V     T = -25 °C: 375.1438489 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:43:23 CEST oafedulidis Assigned to capsule by script
30. Aug 2021 14:08:39 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:27:37 CET jreher Updated box and position via API.
11. Aug 2020 17:57:57 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:09 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:59 CEST jreher Updated box and position via API.
19. Dec 2019 16:20:26 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:27 CET jreher Updated box and position via API.
17. Nov 2017 09:39:37 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:38:24 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:26 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:55 CET Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:34:18 CEST Tobias Imported from Hamamatsu datasheet.