RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0908009537 - Archived data from Tue, 11. August 2020 17:58:03 CEST


This is all the information about APD 0908009537. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0908009537
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 4.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 305
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 199
Position in grid: 6
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 379.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.2342643 V     T = -25 °C: 344.7742024 V
Voltage for Gain 150: T = +20 °C: 388.2382105 V     T = -25 °C: 352.2285187 V
Voltage for Gain 200: T = +20 °C: 392.6971614 V     T = -25 °C: 356.4343283 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.445356847 V-1     T = -25 °C: 4.963534939 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.552651176 V-1     T = -25 °C: 9.145300876 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.69643506 V-1     T = -25 °C: 16.1668298 V-1
Break-through voltage: T = +20 °C: 408.5162737 V     T = -25 °C: 372.0001823 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:40 CET jreher Updated box and position via API.
11. Aug 2020 17:58:03 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:11 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:02 CEST jreher Updated box and position via API.
19. Dec 2019 16:33:22 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:29 CET jreher Updated box and position via API.
17. Nov 2017 09:39:30 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:37:37 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:19 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:54 CET Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:34:16 CEST Tobias Imported from Hamamatsu datasheet.