RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0908009519 - Archived data from Tue, 11. August 2020 17:58:01 CEST


This is all the information about APD 0908009519. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0908009519
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 305
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 199
Position in grid: 1
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 381.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.816332 V     T = -25 °C: 347.5183247 V
Voltage for Gain 150: T = +20 °C: 389.7739481 V     T = -25 °C: 354.7696218 V
Voltage for Gain 200: T = +20 °C: 394.2063435 V     T = -25 °C: 357.8121127 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.607106023 V-1     T = -25 °C: 5.465822085 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.053740272 V-1     T = -25 °C: 26.55526346 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.94119753 V-1     T = -25 °C: 15.40783594 V-1
Break-through voltage: T = +20 °C: 410.0365144 V     T = -25 °C: 373.459385 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:39 CET jreher Updated box and position via API.
11. Aug 2020 17:58:01 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:10 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:01 CEST jreher Updated box and position via API.
19. Dec 2019 16:33:21 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:29 CET jreher Updated box and position via API.
17. Nov 2017 09:39:30 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:37:37 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:19 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:54 CET Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:34:15 CEST Tobias Imported from Hamamatsu datasheet.