RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0902009226 - Archived data from Tue, 11. August 2020 17:56:12 CEST


This is all the information about APD 0902009226. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0902009226
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H06
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 376 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 294
Position in Box: 29
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 186
Position in grid: 1
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 376 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.6040134 V     T = -25 °C: 341.6548042 V
Voltage for Gain 150: T = +20 °C: 384.5745357 V     T = -25 °C: 348.9382013 V
Voltage for Gain 200: T = +20 °C: 389.0067647 V     T = -25 °C: 353.1572749 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.369882167 V-1     T = -25 °C: 4.775700701 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.198099258 V-1     T = -25 °C: 9.288926939 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.30788235 V-1     T = -25 °C: 14.78390838 V-1
Break-through voltage: T = +20 °C: 403.2750078 V     T = -25 °C: 367.7335965 V
   
Notes: Wrong wafer number in serial number, correct wafer number is 3.


Version history

Time Author Change comment
05. Feb 2021 11:26:13 CET jreher Updated box and position via API.
11. Aug 2020 17:56:12 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:28 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:19 CEST jreher Updated box and position via API.
19. Dec 2019 15:44:45 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:05 CET jreher Updated box and position via API.
17. Nov 2017 09:39:23 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:37:17 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:11 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:53 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:03:47 CEST Tobias Added note about wrong wafer number.
22. Jun 2016 15:31:43 CEST Tobias Imported from Hamamatsu datasheet.