RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0902009150 - Archived data from Fri, 05. February 2021 10:55:25 CET


This is all the information about APD 0902009150. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0902009150
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A10
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 391.5 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 55
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.6872028 V     T = -25 °C: 355.4732355 V
Voltage for Gain 150: T = +20 °C: 399.5789637 V     T = -25 °C: 363.1001268 V
Voltage for Gain 200: T = +20 °C: 403.8750399 V     T = -25 °C: 367.29575 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.354799672 V-1     T = -25 °C: 4.594792354 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.86029964 V-1     T = -25 °C: 9.000881593 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48379831 V-1     T = -25 °C: 14.16621242 V-1
Break-through voltage: T = +20 °C: 415.6624995 V     T = -25 °C: 382.4213107 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:29:26 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:10:49 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:55:25 CET jreher Updated box and position via API.
03. Feb 2021 18:21:00 CET jreher Updated box and position via API.
11. Aug 2020 17:27:57 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:26 CET jreher Updated APD location via API.
25. Nov 2019 17:15:14 CET jreher Updated box and position via API.
04. Jul 2019 11:12:42 CEST jreher Updated APD location via API.
18. Jun 2019 13:42:22 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 10:46:17 CEST markus.moritz
22. Jun 2016 15:31:41 CEST Tobias Imported from Hamamatsu datasheet.