RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0902009149 - Archived data from Wed, 03. February 2021 18:21:00 CET


This is all the information about APD 0902009149. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0902009149
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B13
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.1 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 55
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.80527 V     T = -25 °C: 356.2121529 V
Voltage for Gain 150: T = +20 °C: 400.5634666 V     T = -25 °C: 363.8984263 V
Voltage for Gain 200: T = +20 °C: 404.9058497 V     T = -25 °C: 368.2114891 V
Gain/Voltage slope at M = 100: T = +20 °C: 5.154463893 V-1     T = -25 °C: 5.200522217 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.656905102 V-1     T = -25 °C: 9.998148054 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.0677313 V-1     T = -25 °C: 13.15828702 V-1
Break-through voltage: T = +20 °C: 417.0808383 V     T = -25 °C: 383.9884472 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:25 CET jreher Updated box and position via API.
03. Feb 2021 18:21:00 CET jreher Updated box and position via API.
11. Aug 2020 17:27:57 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:26 CET jreher Updated APD location via API.
25. Nov 2019 17:15:14 CET jreher Updated box and position via API.
04. Jul 2019 11:12:42 CEST jreher Updated APD location via API.
18. Jun 2019 13:42:22 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 10:44:58 CEST markus.moritz
22. Jun 2016 15:31:41 CEST Tobias Imported from Hamamatsu datasheet.