RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0902009103 - Archived data from Wed, 03. February 2021 18:21:02 CET


This is all the information about APD 0902009103. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0902009103
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C15
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 387.1 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 55
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.9636636 V     T = -25 °C: 350.7496196 V
Voltage for Gain 150: T = +20 °C: 394.8015957 V     T = -25 °C: 358.2338427 V
Voltage for Gain 200: T = +20 °C: 399.1268279 V     T = -25 °C: 362.4364289 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.470124607 V-1     T = -25 °C: 4.781329798 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.638725144 V-1     T = -25 °C: 9.439353793 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.67682302 V-1     T = -25 °C: 14.60284499 V-1
Break-through voltage: T = +20 °C: 407.3741955 V     T = -25 °C: 375.9248762 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:28 CET jreher Updated box and position via API.
03. Feb 2021 18:21:02 CET jreher Updated box and position via API.
11. Aug 2020 17:28:01 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:27 CET jreher Updated APD location via API.
25. Nov 2019 17:15:16 CET jreher Updated box and position via API.
04. Jul 2019 11:12:44 CEST jreher Updated APD location via API.
18. Jun 2019 13:51:10 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 13:07:45 CEST markus.moritz
22. Jun 2016 15:31:40 CEST Tobias Imported from Hamamatsu datasheet.