RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0822008928 - Archived data from Tue, 11. August 2020 17:36:50 CEST


This is all the information about APD 0822008928. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0822008928
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.6 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 197
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.9653018 V     T = -25 °C: 351.8800477 V
Voltage for Gain 150: T = +20 °C: 395.8643222 V     T = -25 °C: 359.3645555 V
Voltage for Gain 200: T = +20 °C: 400.2385454 V     T = -25 °C: 363.5709889 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.591376332 V-1     T = -25 °C: 4.904268077 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.094934108 V-1     T = -25 °C: 9.016894305 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.12945588 V-1     T = -25 °C: 15.80307412 V-1
Break-through voltage: T = +20 °C: 415.1889236 V     T = -25 °C: 378.7418729 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:17:03 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:01:37 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:13:48 CET jreher Updated box and position via API.
11. Aug 2020 17:36:50 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:57 CET jreher Updated APD location via API.
25. Nov 2019 17:26:24 CET jreher Updated box and position via API.
13. Aug 2019 14:51:44 CEST spankonin Updated APD batch assignment via API.
08. Aug 2019 14:42:02 CEST markus.moritz
22. Jun 2016 15:29:43 CEST Tobias Imported from Hamamatsu datasheet.