RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0822008886 - Archived data from Tue, 06. October 2020 16:52:12 CEST


This is all the information about APD 0822008886. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0822008886
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.3 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 202
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.1837505 V     T = -25 °C: 347.6354432 V
Voltage for Gain 150: T = +20 °C: 391.0584237 V     T = -25 °C: 355.0269665 V
Voltage for Gain 200: T = +20 °C: 395.4387389 V     T = -25 °C: 359.1813717 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.510358539 V-1     T = -25 °C: 5.022273144 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.713099796 V-1     T = -25 °C: 9.291803837 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.07667139 V-1     T = -25 °C: 14.51014236 V-1
Break-through voltage: T = +20 °C: 410.6616992 V     T = -25 °C: 374.390871 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:30 CET jreher Updated box and position via API.
29. Jan 2021 10:24:34 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:12 CEST jreher Updated box and position via API.
11. Aug 2020 17:36:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:04:53 CET jreher Updated APD location via API.
25. Nov 2019 17:26:49 CET jreher Updated box and position via API.
13. Aug 2019 14:51:04 CEST spankonin Updated APD batch assignment via API.
08. Aug 2019 13:24:59 CEST markus.moritz
22. Jun 2016 15:29:42 CEST Tobias Imported from Hamamatsu datasheet.